Prop 150ed
Tren ace 100ed
Both 16 weeks
Yea I already know the tren 16w part is long and high, Going to try and make it though if the sides don't get too bad.
My question is I want to throw slin in there, I'm a virgin in this department though.
1. Would it be a monster mistake to run it with the others?
2. How long and at what time frame?
3. Would it be better to bridge the slin?
Thanks