Results 1 to 2 of 2

Thread: need help!!! Switching from Sust, Mast to Test Cyp, Mast, tren e

  1. #1
    Join Date
    Aug 2008
    Posts
    145

    Exclamation need help!!! Switching from Sust, Mast to Test Cyp, Mast, tren e

    Hey bros i need help making a clean switch of Test forms. Ive been runnin Sust and Masteron for 6 weeks and was planning on throwin in tren for the rest of the cycle. I dont like sust nearly as mush as Cyp, and i have lots of cyp availble so im planning on switching mid cycle.

    Stats are 6'3" 235 lbs. 13% bf 8 years training, 1 year with gear. Currently 3rd cycle.

    Goals are strengthen/ harden with clean diet, high protein, balanced carbs, lots of cardio too.

    So far...
    Sust 500mg per week shot EOD: weeks 1-6
    Masteron 400mg per week shot EOD: weeks 1-6



    I dont like Masteron nearly as much as tren, so i was just going to add tren E into the cycle. Then i also decided to switch from Sust to Cyp for 2 reasons (out of Sust, plenty of Cyp, and Cyp is way better).

    I know Tren E and Test Cyp are usually 2x a week. But to stay consistent with before (and Considering the Mast has to be ED, or EOD) I was going to do the following in a clean switch from one test to another and adding in the tren e....
    Starting week 6:
    Tren E 400 mg a week shot EOD: weeks 6-12
    Cyp 500 mg a week shot EOD: weeks 6-14
    Mast 400 mg a week shot EOD: weeks 6-12 (same as originally planned)

    Last Tren/ Mast (DHT) shot is 2 weeks before last Test Cyp shot. PCT planned for 2 weeks after last Test shot in week 16-19


    Please give feedback or help. Is this a good way to switch? Is this a "clean" switch or will I feel a huge roadbump? Will this f'ck me up with sides or what? Assumming strict pin routine to the hour

  2. #2
    the tren is going to take 4-6 weeks to peak anyway so youll be cutting it just in time for the peak
    if you dont have the balls to shoot masteron every day dont bother. if you use in incorrectly dont expect to like it. if you do decide to man up, masteron can actually be run 4 days before pct, so 2 weeks past cyp
    the cyp should be fine though
    all in all i think youll be disappointed with this cycle in the end, maybe plan better and use the correct esters for your injection phobia next time

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •