Due to some job pledges I have to delay my cycles planning.
Firstly I wanted to do my bulk, rest then make a summer cutter.
Now I'm trying to guess how it could be if I wanted to plan both bulk and cut cycles straight on.
I have 24-26 weeks avaiable for my purposes, PCT included.
Following are four options I was thinking about:
OPTION 1:
12 Weeks bulk cycle with Test E + Deca + Adrol
8 Weeks cutting cycle with Test P + Tren A + Winny
4-5 Weeks PCT
OPTION 2:
12 Weeks bulk cycle with Test E + Deca + Adrol
2 Weeks rest (then start the cutter instead of PCT)
6 Weeks cutting cycle with Test P + Tren A + Winny
4-5 Weeks PCT
OPTION 3:
10 Weeks bulk cycle with Test E + Adrol
2 Weeks rest (then start the cutter instead of PCT)
8 Weeks cutting cycle with Test P + Tren A + Winny
4-5 Weeks PCT
OPTION 4:
10 Weeks bulk cycle with Test E + Adrol
2 Weeks rest
4 Weeks PCT
6 Weeks cutting cycle with Test P Tren A + Winny
4 Weeks PCT
(no pause between two cycles)
Wich one should be the best for my purposes?
Or better, have you guys some better advices to give me?
Thanks
CL


Reply With Quote
sorry but what does that say on ur back? just curious
