I am currently on Test P and Tbol. 50mg/70mg/day. Going lite, as I am on the downside of rehab of shoulder surgery. Everything is going good. Shoulder is strong.
I was going to run this cycle for 8 weeks and everything is right on track. Here comes the problem. I want to extend to the cycle 8 weeks, but I am wanting drop the Tbol and add Tren. Okay, you waited long enough, here is the problem. The first 8 weeks finishes the day I leave to go on a week vacation. Is there a solution to this, to keep the cycle going or is it a dead end and just start my pct.
One solution, as mentioned, stop cycle and start pct.
Second solution, take a chance with sides and start first day I get back with Prop/Tren.
Third solution, try like a frontload of Test E before going on the trip and then start the extention.
Need some good advise on this one.