hey, quick question boys...
Did an 8 week Tren A cycle @ 100eod and Test was kept low @ 250/week just to see how Tren affected me. I was VERY pleased with the results especially since I was assured that I was running was too low on each compound.
After the 8 week was up, I ran the Test for another 2 weeks @ 250 and then dropped to a cruise dose of 125/wk.
I would like to take another run at Tren A using the same 350/wk but upping the Test to 500/wk.
How long should I wait to start this? I was planning on waiting a full 8 weeks since the day I dropped down to the 125/wk test, but I wanted some more opinions before I got back on.
This will be my last cycle and I have a full PCT planned for the end. I already have more than enough HCG, Nolva, Clomid, Letro and Aromasin to run 3 PCT's so it wont be an issue.
I also have a lot of Deca and had considerred the following:
12 weeks
1-12 Test E 400/wk
1-10 Deca 400/wk
3-10 Tren A 350/wk (shot EOD)
Looking for 12-15 solid lbs when its all over.
Current stats:
5'9
210
9%
History: 2-10wk Test C cycles @ 500/wk and 1-8 week Tren/Test Cycle
Any thoughts?
KP