I thought about the Bold ace actually. I’m not just gonna do 12 weeks though. I’m gonna make this first cycle count! No point in being shut down then PCT after such a short amount of time like 12 weeks. At least that’s my thoughts.
I was thinking if I add the EQ now front load it like you said then run it for another 6 weeks (total of 7 weeks on EQ front load on week 1). That’s my thought. I don’t really have a set time frame for how long I want this cycle to run for honestly. This might sound stupid and I’m sure I will get flack from someone but this is my own science experiment and I love this.
Anyways my question would be if I did run EQ not the bold ace do you think my plan above makes sense or would you do something different?