doesnt change the fact its a $hit cycle.well actually, the cycle he advise me is alot!! cheaper then the cycle i was planning on doing
1-Test e shoudl be run atleast 12 weeks as that ester takes 4-6 weeks to peak
2-EQ should be run for 15 weeks to get the full benifts if this was the plan then test should be run that long too
3-Tren ace for 4 weeks is not worth doing.




Reply With Quote
thenx thenx thenx