Results 1 to 4 of 4
Thread: Trying to put a cycle together
-
01-18-2008, 07:41 PM #1
Trying to put a cycle together
I've done alot of gear a couple years back and have been back in the gym for 90 days since being out of the gym from injury.I already have 20 amps of Test Enth I'm gonna get 4 more amps to go 12 weeks but thats not a problem.I'm gonna order some EQ but I was thinking if I'm gonna run the Test Enth for 12 weeks and the EQ for 15 week Would it be ok to throw some Masteron in there the during the last week of the Test Enth,cause I wanna run the masteron the last 4 weeks at the end of the cycle eod 100 mgs.
Test E 1-12 500 mgs
Equipoise 1-15 300 mgs
Masteron 12-15 100 mgs eod.
Age 27 178lbs/5'9/plenty of cycles/diet is in check/What pct should I run?
-
01-18-2008, 07:46 PM #2
personally i'd run mast 2 weeks past testE
if you want to run EQ that long i'd start it a few weeks before u run test for 2 reasons
1) EQ wont cause complete suppression
2) It would be nice if all ur compounds left ur system at the same time so u can start pct more effectively.
also i'd up ur EQ dose and lower ur test dose.
so all in all something like this
wks 1-14 EQ 400-500mg/wk
wks 3-14 testE 250-400mg/wk
wks 13-16 masteron 350mg/wk
nolva and aromasin should be fine or hell even nolva and arimidex would suffice imo.
-
01-18-2008, 08:56 PM #3
I was under the impression that test should be ran at least 25% more then EQ for them to be at there most effective.
-
01-18-2008, 08:58 PM #4
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
So far so good, they seem to be doing what they’re supposed to.
Expired dbol (blue hearts)