Results 1 to 40 of 46

Thread: 6th Cycle Help - Prop/Tren A/T bol lean bulk transitioning into cut cycle

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Join Date
    May 2010
    Location
    New York
    Posts
    334
    Ive heard masteron is needed in longer duration then a few weeks so i'd look into that

  2. #2
    Join Date
    Dec 2007
    Location
    Glass Case of Emotion
    Posts
    3,721
    Quote Originally Posted by RB3232 View Post
    Ive heard masteron is needed in longer duration then a few weeks so i'd look into that
    true, like anything else it takes awhile to build up in your system. I would be running the masteron the last 6 weeks of my cycle alongside tren A and prop. I like the thought of masteron just don't want to lose my hair...note: I have never (knock on wood) had a problem with hairloss on any test, dht, deca, or tren.

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •