
Originally Posted by
600@50
Hey Ronnie. I was rereading the first part of the Slingshot method and have a question on actual workouts. I'm a powerlifter and would like to know your opinion on the Westside Louis Simmons method of training. Specifically the 1 max effort workout and the 1 speed day workout per week for each lift. What are your thoughts on the multiple short rest 45-90 seconds between sets on speed day? The Westside Louis Simmons method for power-lifting is very good. The reason for the speed day using less rest time between sets has to do with building explosive power and strength endurance which helps with both coming out of the hole and being able to finish getting the weight up. For example, when doing bench presses you need explosive-power developed through speed training to get the bar off your chest and then you need strength-endurance by performing multiple short- rest- sets to continue pushing through with the movement when you hit a sticking point. is this beneficial or too short of a rest period. Also Westside basically maxs out on some movement each week. Not necessarily the lift itself but something that is supposed to benefit the lift. It may be inclines or weighted dips for the bench press or just a max set of 6, 8 or 10 reps. Thanks man.